Q2 Metals Extends Mineralized Zone Strike Length to 1.5 Kilometres and Concludes the 2025 Winter Program at the Cisco Lithium Project in Quebec, Canada
Highlights:The 2025 Winter Program concluded with 6,997 metres (m) drilled across 14 holes.Drill hole CS25-028 encountered eight (8) spodumene pegmatite intervals, with the widest interval of 50.9 m of continuous spodumene pegmatite, along with additional noteworthy intercepts of 21.5 m and 19.3 m.Drill hole CS25-036 encountered 13 spodumene pegmatite intervals, with the widest interval of 64.3 m of continuous spodumene pegmatite, along with additional noteworthy intervals of 22.3 m, 18.1 m and 12.7 m. Hole 36 ended in pegmatite at a depth of 308.6 m due to time constraints.Assays are pending on all 14 drill holes completed in the 2025 Winter Program.The northeast-southwest strike of the main zone has increased to 1,500 m (previously 850 m at the end of 2024).Vancouver, BC, Apr 28, 2025 – (ACN Newswire via SeaPRwire.com) – Q2 Metals Corp. (TSX.V:QTWO)(OTCQB:QUEXF)(FSE:458) (“Q2” or the “Company”) is pleased to provide an update on the Winter 2025 expansion drill program (“2025 Winter Program”) at the Company’…