Q2 Metals Intercepts 179.6 Metres of Continuous Spodumene Pegmatite in Large Step-Out at the Cisco Lithium Project in Quebec, Canada
Highlights:Drill hole CS25-027 encountered seven (7) spodumene pegmatite intervals, with the widest continuous interval of 179.6 metres (m), followed by two additional intervals of 58 m and 91.8 m of continuous spodumene pegmatite.Drill hole CS25-024/24A intersected a total of six (6) individual spodumene pegmatite intervals, with the widest continuous interval of 39.5 m.Drill hole CS25-025 encountered nine (9) spodumene pegmatite intervals, with the widest continuous interval of 20.4 m.Drill hole CS25-026 encountered 10 spodumene pegmatite intervals, with the widest continuous interval of 21.2 m.Assays are pending on the approximately 2,570 m of core drilled in the first four (4) holes completed to date in the winter drill campaign at the Cisco Project.Drilling continues with step outs to both the east and south.Vancouver, BC, Mar 19, 2025 – (ACN Newswire via SeaPRwire.com) – Q2 Metals Corp. (TSXV:QTWO)(OTCQB:QUEXF)(FSE:458) (“Q2” or the “Company”) is pleased to announce the completion of the first four hole…















